Emergency Fuel Distribution Strategy in Conditions of Transportation Access Disruption due to Flooding: A Case Study of the Sumatra Region
Keywords:
Fuel Distribution, Sumatra Floods, FMEA, FTA, Risk Response PlanningAbstract
Transportation disruptions caused by flooding in the Sumatra region often lead to the paralysis of fuel distribution, impacting economic stability and emergency services. This study aims to develop a resilient emergency distribution strategy by identifying critical risks and root causes of failure. The methods used are the integration of Failure Mode and Effect Analysis (FMEA) to determine risk priorities through Risk Priority Number (RPN) and Fault Tree Analysis (FTA) to track the root causes of technical and managerial failures. The results of the study show that seven risk indicators exceed the Critical Value of the average Total RPN Value of 186,89, with the highest risks being in the Fuel Distribution Infrastructure (252.93) and Main Line Vulnerability (226.38). FTA analysis confirmed that dependence on satellite connections in blank spot areas and bureaucratic obstacles were the main factors hindering distribution. As a solution, a Risk Response Plan was developed, which includes:1) Preventive Action through automatic data synchronization (Digital Ground Checking) and a Green Route MoU; 2) Mitigation through the provision of an alternative fleet (4x4 and ships) with a standby contract system; and 3) Corrective Action in the form of mobilizing heavy equipment and a rapid recovery team. This study provides a strategic framework for maintaining regional energy security even when land infrastructure is completely disrupted.
References
A, S., & N, Z. S. (2004). Joint Technical Committe Risk Management. Standart Risk Management, 4360.
Abrar Husen, M. (2009,2011). Manajemen Proyek. Jakarta.
Amalia, R. (Sept 2012). Analisa keterlambatan proyek pembangunan sidoarjo Town Square menggunakan metode Fault Tree Analysis (FTA). In Jurnal Teknik ITS Vol 1 No 1 (pp. ISSN : 2301-9271). Surabaya: Institut Teknologi Surabaya.
Andinda, F. M. (2014). Analisa keterlambata proyek menggunakan metode fault tree analysis (FTA).
Aningrum, A. S., Rudianto, H., Mahmudi, A., & Prasetyo, E. (2024). Analisis Faktor Penyebab Keterlambatan menggunakan metode fault tree analysis (Studi Kasus pembangunan Office Headquarter Surabaya). Jurnal Inter Tech.
Clemens, P. L. (2002). Fault Tree Nalysis, Fourt edition. In J. Sverdrup. George Washington University.
Fafedi Eting, F. (1945, Agustus 17). Menghitung Biaya dan Waktu dengan metode Critical Path Method pada proyek pembangunan double decker mapolda Jawa Tengah. Jurnal Teknik UNTAG VOL.1 No 35 (2018) ISSN : 1701-8101.
Fitria, M., & Faisal. (2009, Desember). Penggunaan Aljabar Boolean dalam menganalisis kegagalan pada Fault Tree Analysis. Jurnal Matematika Murni dan Terapan Vol 3 No 2, 27-38.
Frame, J. D. (2003). Managing Risk in Organizations, a guide for managers. San Fransisco, USA: Jossey Bass.
Gasperz, V. (2001). Total Quality Management. Jakarta: PT Gramedia Pustaka Utama.
Hanafi, M. M. (2006). Manajemen Risiko. Yogyakarta: Unit Penerbitan Percetakan Sekolah Tinggi Ilmu Manajemen YKPN.
Jervis, B. M., & Levinn, P. (1988). Construction Law. McGraw-Hill: Inc.
Johsonbaugh, R. (2001). Discrete Mathematics Fifth Edition. Pretince Hall: New Jersey.
Lipschutz, S., & Marc Lars Lipson. (2001). Seri Penyelesaian Soal Schaum Jilid 1 Matematika Diskrit. Jakarta: Salemba Teknika.
McDermott, R. E., Mikulak, J. E., & Beauregard, M. R. (1996). The Basics of FMEA. New York: Productivity Press.
Rosih, R. A., Choiri, M., & Yuniarti, R. (n.d.). Analisis Risiko Operasional pada Departemen Logistik dengan menggunakan metode FMEA. Jurnal rekayasa dan manajemen sistem industri Vol 3 No 3 Teknik Industri Universitas Brawijaya.
Servanio, D. (2019). Analisis Penyebab keterlambatan pada proyek pembangunan gedung kandang hewan Fakultas Kedokteran Unair C Surabaya menggunakan metode Fault Tree Analysis (FTA). Jurnal Teknik Untag Vol 1 No 22, ISSN : 1701-9601.
Tchankova, L. (2002). Risk identification - basic stage in risk management. Enviromental Management and Health, Vol.13, pp.290-297.
Vaughan, C. A. (1976). Risk Management and Isurance. New York: Mc Graw-Hill.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Revika Shintha Mustika, Melia Eka Lestari

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.









